Skip to content
Ecosol Limited
OIC Road, Old Yundum The Gambia
[email protected]
(+220) 877473692
  • Home
  • About
  • Services
  • Projects
  • News & Events
  • Contact Us

Archives

Ecosol Limited > Portfolio

Pre-Feasibility Study on Sustainable Practices for Solid Waste Management of the Bakoteh Dumpsite for SOS Children’s Villages, The Gambia

Bringing Hooded Vultures Back to Life

Tesitoo.com – Gambia’s Online Farmers Market

Feasibility Study on Waste to Energy for Power Generation in The Gambia

Recent Posts

  • Validation Workshop of Feasibility Study on Waste to Energy for The Gambia on 9 March 2022 by Ecosol Limited.
  • WASTE TO ENERGY PRODUCTION WITHIN THE MUNICIPALITIES IN THE GAMBIA
  • Waste management and child right violation in The Gambia, the case of the Bakoteh Dumpsite
  • 14th Edition Trade Fair Gambia International
  • Ecosol Limited Trip to Mile 2 Dumpsite, Banjul, The Gambia

RECENT POSTS

  • Validation Workshop of Feasibility Study on Waste to Energy for The Gambia on 9 March 2022 by Ecosol Limited. November 7, 2022
  • WASTE TO ENERGY PRODUCTION WITHIN THE MUNICIPALITIES IN THE GAMBIA September 11, 2020
  • Waste management and child right violation in The Gambia, the case of the Bakoteh Dumpsite July 29, 2020
  • 14th Edition Trade Fair Gambia International January 31, 2020

Get in Touch

+2204382263
[email protected]
Kanifing
Jimpex Road

Social Media

Facebook
LinkedIn

Company

  • About
  • Company
  • News & Events
  • Privacy Policy
  • Faq

Latest Post

  • Validation Workshop of Feasibility Study on Waste to Energy for The Gambia on 9 March 2022 by Ecosol Limited. November 7, 2022
  • WASTE TO ENERGY PRODUCTION WITHIN THE MUNICIPALITIES IN THE GAMBIA September 11, 2020

Video

https://www.youtube.com/watch?v=aBr6LAlG5N0
Copyright © 2026 All Rights Reserved | Ecosol